Rod floating
MEDIUM39.4%
Reduce SPM and verify pump fillage / dynamometer card.
WELL B-12 · DEMO MODE · REPRESENTATIVE DATA
One consolidated reliability workspace for SRP rod floating, impact loading, rod failure, pump unsetting and maintenance priority.
80/100
Overall equipment health
Rod floating
MEDIUM39.4%
Reduce SPM and verify pump fillage / dynamometer card.
Impact loading
MEDIUM38.5%
Lower VFD response and align stroke with the recommended SPM.
Rod failure · 7 day
MEDIUM37%
Inspect rod-string connections within 48 hours if risk remains elevated.
Pump unsetting
LOW28.6%
Restore intake stability by reducing dynamic load and maintaining thermal response.
Shared rod-load and composite-risk trend
Maintenance recommendation · PLANNED priority
Primary contributors are 598 cP crude viscosity, 92.1% rod load and 5.8 SPM. Predicted RUL proxy: 83 days.
All risk percentages, maintenance timing and RUL are synthetic prototype estimates generated from the same simulated Well B-12 state.