WELL B-12 · DEMO MODE · REPRESENTATIVE DATA

EQUIPMENT RISK + PREDICTIVE MAINTENANCE

One consolidated reliability workspace for SRP rod floating, impact loading, rod failure, pump unsetting and maintenance priority.

80/100

Overall equipment health

Rod floating

MEDIUM

39.4%

Reduce SPM and verify pump fillage / dynamometer card.

Impact loading

MEDIUM

38.5%

Lower VFD response and align stroke with the recommended SPM.

Rod failure · 7 day

MEDIUM

37%

Inspect rod-string connections within 48 hours if risk remains elevated.

Pump unsetting

LOW

28.6%

Restore intake stability by reducing dynamic load and maintaining thermal response.

Abnormal loading detection

Shared rod-load and composite-risk trend

T-24sT-18sT-12sT-9sT-6sNow0255075100

Maintenance recommendation · PLANNED priority

Maintain the optimized SRP envelope.

Primary contributors are 598 cP crude viscosity, 92.1% rod load and 5.8 SPM. Predicted RUL proxy: 83 days.

Recommended action: reduce SRP speed, maintain CSS soak response and review the next downhole card.

All risk percentages, maintenance timing and RUL are synthetic prototype estimates generated from the same simulated Well B-12 state.