01
Critical rod-float signal
Baghewala Field · B-12 CSS + SRP monitoring
The model detects the heavy-oil failure pattern: reservoir cooling drives viscosity up, loading rises, and SRP performance starts to deteriorate.
Closed-loop AI workflow
01
Critical rod-float signal
64°C
Reservoir temperature · D12
690 cP
Modeled viscosity after cooling
91%
Detection confidence
Representative B-12 telemetry across a CSS production cycle.
AI model verdict · Well B-12
91% confidence
Cooling after CSS has increased modeled viscosity. At 10 SPM, the rod string is operating above the representative safe loading envelope.
Representative events prioritized by risk, production exposure and model confidence.
| Event | Signal | Observed / limit | Confidence | Severity | State |
|---|---|---|---|---|---|
| ANM-B12-01 Well B-12 · SRP | Rod-float risk | 82% / 60% | 91% | critical | Open |
| ANM-B12-02 Well B-12 · Reservoir | Thermal decline | 64 °C / 68 °C | 88% | high | Open |
| ANM-B17-01 Well B-17 · SRP | Impact loading | 54% / 50% | 82% | warning | Watching |